A Brownfields and Land Recycling Success Story


by Gary Brown, President


Pennsylvania's Governor, Tom Ridge, has announced a Land Recycling grant for the former O'Brien Machinery site in Downingtown, PA. The announcement marks the largest grant ever awarded through the Industrial Site Reuse Grant program for a single project. The project has been heralded as a model of federal-state-local cooperation, being one of the first sites where residential redevelopment of a former Brownfields site is going to be achieved. Innovative PCB remediation techniques are helping to make redevelopment possible and both local and EPA officials are working with state officials to implement a "showcase" Land Recycling project. 


Bruce Beitler and Gary Brown


** Bruce Beitler, PADEP Regional Land Recycling Coordinator and Gary Brown, President of RT, discussing the recently awarded contract with a Downingtown official. **



Site History 


The 22 acre site was a foundry in the 1800's and eventually became an electrical equipment repair and refurbishment facility in the middle of this century. Very large electrical generators and other equipment were present until recently, and the release of dielectric fluids caused the large industrial building at the site to become PCB contaminated. On three occasions, it became necessary for EPA to expend Superfund monies to address releases at the site. Michael Towle, EPA Remedial Project Manager, lead a team which remediated the site to commercial/industrial standards. 







Risk Management 


RT prepared a risk assessment review for the site to help demonstrate that contaminants which remain at the site are of limited concern. RT investigated the site and installed borings and monitoring wells to provide site-specific data to support Brownfields and Land Recycling initiatives. EPA has requested, as part of a Prospective Purchase Agreement that the floor of the building be remediated to residential standards prior to residential redevelopment.


A new surface PCB remediation technique, offered by NETC, will be used to remediate sections of the floor which are to remain at below residential standards. Other remedial needs at the site include remediation of a floor drain area and UST removal. A PADEP Land Recycling grant, and potentially, a Brownfields grant will help fund remedial activities, which are expected to take two to three months to complete. RT has already demonstrated that groundwater at the site is not impacted and a stream running through the site (Parke Run, a tributary to the Brandywine Creek) is viewed as an important asset to be worked into the redevelopment scheme for the site. 


Redevelopment 


Downingtown Borough supports the residential redevelopment of the site because surrounding areas are residential and the site is close to the downtown business area. The Downingtown Main Street Association, through its Director, Barry Cassidy, is actively helping to move the project forward. PADEP has reviewed the project, which is going through Pennsylvania's award winning Land Recycling Program. Bruce Beitler, PADEP's Land Recycling Coordinator, approved the project as being acceptable for an Act 2 Grant.


The majority of the site will see residential redevelopment including apartments and/or townhouses. Massive foundations from the heavy industrial buildings at the site are planned to be used as residential building foundations and/or as a base for parking lots. A developer is expected to be selected for the site shortly, and site plan and local approval processes will also be under way in the near future. 


The abandoned facility has been an eyesore for some time, but cooperation by all parties is allowing the project to move quickly forward. Those with key roles in the project include: 


Project Sponsor: Serena, Inc., Washington, D.C.
Gary Silversmith
Counsel: Janet Kole, Esq.
EPA Officials: Thomas Cinti, Esq.
Michael Towle
Linda Watson
PA DEP Officials: Bruce Beitler
Robert Day-Lewis
Alex Reyda
Downingtown Main St. Official: Barry Cassidy
Environmental Consultant: RT Environmental Services, Inc.
Rob Monahan
Mike Gonshor, P.G.
William Silverstein, P.E.
Floor Remediation Contractor: NETC:
Dennis Pennington


The proactive risk management approaches used on this project have demonstrated that focused environmental professionals, working together, can develop reasonable approaches to reuse sites. Residential reuse of many heavy industrial sites was not feasible in the past, but with reasonable risk assessment reviews and advances in remedial technologies, new options are available for even "highest and best" site reuse. Since "they're not making any more land," this is great news for America's cities.


Redeveloper's Comments


"Without the thorough and diligent environmental analysis performed by the RT Environmental personnel, this project would have never happened. With RT's guidance, we were able to clean-up a PCB-contaminated industrial site with abandoned industrial buildings full of lead paint, asbestos, aboveground storage tanks and underground storage tanks. Not only was the site completely cleaned to residential standards, but we received both an EPA Prospective Purchaser Agreement and liability releases from DEP for PCBs, lead, arsenic and benzopyrene. If RT could clean-up this brownfields site, they can surely handle any site..." 


- Gary Silversmith 


ACT 2 LAND RECYCLING COMES TO MANHEIM - FORMER RAYMARK INDUSTRIES REDEVELOPMENT PROJECT


The Phoenix Group, LLC recently announced the implementation of a large Brownfields redevelopment project in Manheim, Pennsylvania. The location is the former Raymark Industries Manufacturing facilities, where manufacturing operations ceased several years ago. RT has been active at this site since 1995, having assisted the Company with closure of a RCRA landfill at the site.

The Manheim project presented a number of difficult technical and logistical challenges. Due to litigation surrounding asbestos products manufacturing, an initial bankruptcy in the early 1990’s had allowed for reorganization of assets, and continued asbestos manufacturing for products which have no substitute, by Universal Friction Composites (UFC). UFC continued limited operations at the facility and Raymark Industries, in the mid-1990’s, remained as landlord at the facility. Raymark began discussions in 1996 with the Pennsylvania Department of Environmental Protection, following promulgation of the Act 2 Land Recycling Program to find out how to address environmental issues at the site.


However, hopes for Brownfields redevelopment were dashed when the Company was drawn to a second bankruptcy, related to ligation surrounding its former Connecticut operation, which had become a Superfund Site. Due to the attractiveness of the Act 2 Program in Pennsylvania, however, both Raymark’s upper management and a subsequent bankruptcy trustee wanted to take advantage of the Pennsylvania Land Recycling Program, to obtain cleanup liability protection for releases at the site. As the direction became clear as to how to resolve issues involved in the second bankruptcy, RT was engaged to: 


  • finish the RCRA landfill closure and adjacent wetlands restoration work;
  • consolidate waste materials for future removal;
  • conduct a site investigation to determine what releases to soil and/or groundwater were of concern;
  • remove underground storage tanks at the facility.

In addition to the normal Land Recycling investigation work, due to the presence of Chiques Creek and Doe Run , which run through and adjacent to the facility, RT implemented upstream and downstream water sampling, which showed non-detect concentrations for key constituents of concern, including lead. A key issue RT was able to resolve regarding the historical waste products, was that tetraethyl lead used in the compounding of the friction products (including brake shoes), was compounded in such a way that leachability was minimal. This finding helped to resolve a key technical question - why hadn’t monitoring wells near the RCRA landfill, shown impacts to groundwater, even though the compound product itself tested as characteristic hazardous for lead? RT comprehensively reviewed historical groundwater monitoring data, and conducted waste characterization leaching tests, which showed that the leachability from the material is minimal. 


Given the complexity of the site, and need for real time decision making, RT requested that the Pennsylvania Department of Environmental Protection to assist with weekly field meetings, so that the Land Recycling investigation process could be as focused and as efficient as possible. Pennsylvania DEP’s South Central office Environmental Cleanup Program was instrumental in providing assistance, assigning a hydrogeologist to work closely with RT as initial investigation work showed what releases would need Act 2 cleanup liability protection at the site. Solvent impacted groundwater as well as an historical asbestos products landfill, and storage tank releases will be the subject of the Act 2 Land Recycling process. Deteriorating buildings where asbestos products were manufactured are also of concern, and a redevelopment plan is under discussion with Borough officials, which is expected to call for demolition of a large portion of the Lower Mill buildings, which have little future useful life, and which are asbestos contaminated. The Borough, understanding the situation, had the site designated a Keystone Opportunity Zone, which helps facilitate redevelopment by offering tax abatements. 


A portion of the Lower Mill lies in the floodplain, and Manheim Borough has been instrumental in providing a new city park, on land on the opposite side of Chiques Creek, so Manheim is a leader in proper use of the floodplain through its overall planning process. The redevelopment plan takes into account proper floodplain use on the mill side of the creek as well. 


Herman Ramig, long-time Engineering Manager at the property, has worked very hard to keep the property viable, by attracting various tenants who have workshops, auto reconditioning facilities, as well as storage operations at the site. Gary Silversmith of the Phoenix Group, LLC announced that the Upper Mill facilities, which are newer and were constructed after World War II, are expected to attract a variety of industrial and commercial tenants, as more space becomes available in the coming months and years, following the decommissioning of the remaining manufacturing operations in a number of the buildings. An additional focus is on twenty-seven (27) acres of undeveloped expansion area, which has direct rail access by Norfolk Southern, and could attract new industries to the mill complex. Also being considered is conversion of the Company mid-rise office building to a Technical Center, with high-speed Internet access. Manheim Borough has been planning for resurgence of the Mill property in recent years, and has already made application for funds to provide improved access to the Mill complex from Fruitville Pike, which will minimize future commercial and industrial traffic through narrow Borough streets. 


Pennsylvania is one of the only states in the nation where successful Brownfields initiatives such as that used at this Mill complex, can be handled in both an efficient and "transaction" timeframe manner. Doug Lashley and Nick Rudi, of the Phoenix Group, LLC are also hard at work on additional grant and redevelopment opportunities, as well as sensitive future use of the floodplain, which constitutes a number of acres at the property. Mr. Lashley has in-depth expertise on wetlands restoration projects, and the redevelopment plans of the property will take the unique situation of a creek and tributary confluence and floodplain at the site into account. 


Although there are a number of important issues to still deal with at the Mill complex, the attractiveness of Act 2 cleanup liability protection, cooperative assistance from the Pennsylvania Department of Environmental Protection’s South Central office, and flexible Land Recycling options available, proves that Pennsylvania’s award-winning Act 2 Land Recycling Program works, even in the face of obstacles including limited funds, a RCRA landfill, and a double bankruptcy.


Lancaster County’s growing economy, along with the availability of grants and loans to help facilitate redevelopment of the Mill complex, means that better days are ahead for Manheim, as the Mill complex which was becoming an eyesore, now has a bright redevelopment future, with Act 2 Land Recycling cleanup liability protection being available to help facilitate the redevelopment process. Tom Showers, Manheim Borough Council President, has indicated that the Borough wants to work with the new owners, to help make the redevelopment project a success.


Project Participants


• Redevelopers
  Gary Silversmith, Doug Lashley, Nick Rudi
• Raymark Industries
  Herman Ramig
• Trustee
  Wendy Shapss, Laureen Ryan
• Manheim Borough Officials
  Tom Showers, Charles Lyon, Rob Stoner
• DEP Officials
  Patty Romano, Eric Rooney
• RT Staff -
 
  Matt Martelli and Chris Orzechowski -
  Tank Removal & Field Investigations
  Larry Bily - Waste Inventory & Consolidation
  Mark Irani, P.G. - Remediation
  Gary Brown, P.E. - Principal-in-Charge




PEOPLE WHO MAKE BROWNFIELDS HAPPEN!
Profile: Herm Ramig


All of those who participate in engineering projects know that there are key individuals who are instrumental in making things happen. Some individuals, due to their commitment and attention to detail, make projects much more smooth and efficient than they otherwise could or would be. One such individual is Herm Ramig, the person with "all the knowledge and commitment" at the former Raymark Industries, Manheim plant.


Mr. Ramig, a key engineer at the plant, worked there since the 1970’s, through thick and thin. When manufacturing scalebacks occurred, he kept the mill buildings occupied by bringing in tenants and handled extensive utility conversions when utility and boiler operations were shutdown. Landfill cap problems (groundhog holes) were addressed by grabbing a shovel and doing the work, something few people with 30 years at a plant are willing to do.


To facilitate the Land Recycling process, he assisted RT with:


  • Frequent and in-depth research on units, tanks and historical uses.
  • Calling former employees and managers to answer key questions on historical waste management practices. 
  • Being up early and working late to facilitate long schedules for investigation and tank removal work. 

Even though money was scarce when manufacturing operations ceased, Mr. Ramig saw to it that tanks were pumped out and waste was consolidated into safe ares. He also kept the Mill buildings in safe condition, and quickly responded to a fire caused by vandalism, securing the site to the satisfaction of Borough officials. What makes the difference? When you have an outstanding individual who cares about a site, Land Recycling is so much easier because the work is focused with full, knowledge of historical operations and far fewer "unknowns" to deal with.


We at RT salute Herm Ramig as proof that people who care make all of the difference. Having an individual like Mr. Ramig and using the Pennsylvania Award Winning Land Recycling Program means a highly efficient Brownfields effort, with quick focus on the important problems, and facilitating earlier redevelopment of the Mill complex.



Call RT for more information on Brownfields Site Services at (800) 725-0593